Inpection Request

 

Inspection Schedule Change - 9/2/14

(See home page for additional information)

Effective September 2, 2014, electrical inspections will be limited to Monday, Wednesday and Thursday.  We will make every attempt to do plumbing inspection Monday through Friday. We intend to do other non-electrical/plumbing inspections Monday through Friday as well (e.g. Structural, including footings/stemwall, insulation; Mechanical, including wood stove installations, fans, heat-pumps, gas lines, etc.) depending on staff availability.

In order for us to provide the most efficient and predictable service, it is requested that plumbing inspections also be requested for Monday, Wednesday and Thursday.  Further, since rough framing, plumbing, electrical and mechanical inspections are done at the same time, those inspections will be most efficiently addressed when requested for Monday, Wednesday and Thursday in order to include electrical.

 

At this time, we intend to keep other inspections and schedules consistent with our current format.  Illinois Valley inspections will still be Monday, Wednesday and Friday; Inspection requests received by 5:00pm will be scheduled for the next day.

 

Notes:

Inspections are required to be requested by the permit holder.  (i.e. Electrical contractor will request inspection of the work under his permit.  The plumbing Contractor will request the plumbing, etc.)

A request for a "Framing" inspection will be held until rough plumbing, rough electrical and mechanical are requested.  They will all be done at one time.

Requests received by 5:00 P.M. will be done the next day. (See below for Illinois Valley days of inspection)

 
* Project Address:
 
* Name:
 
* Phone Number:
 
* Owner or Contractor
Owner
Contractor
Building Inspections:
Foundation
Stemwall
Slab
Floor Framing
Rough Framing
Insulation
Final
Mechanical Inspections:
Mechanical under-floor
Mechanical rough-framing
Chimney
Fireplace
Gas Test
Gas Piping
Final
Electrical Inspections:
Service
Concrete Encased Electrode
Pool Bonding
Slab
Trench
Rough
Final
Plumbing Inspections:
Under-slab
Rough
Top out
Shower pan
Sewer
Water
Pool and Barrier Inspections:
Concrete Reinforcement
Barriers and Final
Other type of inspection:
 
Other than Illinois Valley - Day of Inspection (See Note above regarding Inspection Schedule Changes-9-2-14)
Monday
Tuesday
Wednesday
Thursday
Friday
Illinois Valley - Day of Inspection (See Note above regarding Inspection Schedule Changes-9-2-14)
Monday
Wednesday
Friday
Specific Date: 
Comments or additional information:
 
 
If you have any questions, please call 1-541-474-5405 or email to bldgsafe@co.josephine.or.us
 
If you have questions regarding the site, please contact the webmaster.
Terms of Use | Built using Project A's Site-in-a-Box ©1998-2014 Version 5.12.7